Reports: Executive Director’s Reports by Topic

Construction Incident

October 11, 2005 On September 26, our drill rig punctured a BWSC water line at the corner of Washington and West Dedham Streets. The location had been marked by BWSC as part of Dig Safe procedures, and the vacuum truck had previously checked the location. The line was not BWSC’s map. Fortunately, there were no injuries and no serious property damage. BWSC is taking care of the cost of repairs. After receiving Christian’s call, I went to the site and wound up talking to reporters from all of the local television stations. We have received no negative feedback from the incident.