WELL MONITORING
The BGwTs latest set of readings are indicated below.
Wells were read from Apr. 15th - May 10th, 2010
There are currently 705 wells in the West network. Of the 705 wells read:
- 57 wells @ elevation >9
- 146 wells @ elevation 7-9
- 292 wells @ elevation 5-7
- 162 wells @ elevation 3-5
- 25 wells @ elevation <3
- 0 wells @ Dry
- 23 wells @ no reading
- 85 Recharge Locations
We have read 85 wells in the East network (East Boston Area). Wells were read in East Boston on Apr. 13th & 14th, 2010. Of the 85 wells read:
- 24 wells @ elevation >9
- 25 wells @ elevation 7-9
- 14 wells @ elevation 5-7
- 7 wells @ elevation 3-5
- 14 wells @ elevation <3
- 0 wells @ Dry
- 1 wells @ no reading
NOTE: We are continuously reading the well network and started a new set of readings on Tuesday May 11, 2010 with our returning part-timer Robert Tully from Wentworth Institute of Technology. Robert worked out extremely well for us during his co-op and we have decided to re-hire him on a part-time basis for the summer semester.
LEVELOGGERS
- We continue to upload dataloggers at the following locations on a weekly basis:
- 1 on Saint Charles St. and 2 on Cazenove St.
- 5 along the Storrow Drive Underpass from Embankment Rd. Clarendon St.
- 4 loggers have been placed in wells in Back Bay closest to the alleys that BWSC are replacing lines and installing recharge systems
- Additional loggers have been placed in the Fenway, South End, and Back Bay.
CONTOURS
- We continue to generate contours for all areas of our well network. Elliott and I have reviewed them with our technical committee.
- We will continue to receive the contours from BWSC and will be sending them our contours for comparison.
ISD RESEARCH
- We continue to look for building permits and any underpinned buildings.
- I continue working on the South End.
RECHARGE TAB
- A new tab for Recharge is now posted on the BGwT website. It describes my role as Recharge Coordinator and provides examples of different types of Recharge.
WELL INSTALLATION
- We have a signed contract for our 17 OW Installation. We are awaiting approval from PIC to proceed with scheduling the installations.